Avoid building where spring tides flood
In Savebot: The Last Garden, keep permanent work above ground that floods in a spring tide. Forgeur Games warns that spring tides rise over beaches and flood buildings placed too low. Treat the foreshore as a temporary collection area.
Full Steam release unless a source specifies the demo. Evidence checked . Guide updated .
Steps
- Watch where the water reaches when the tidal state changes. Compare an accessible foreshore spot with land farther up the island before committing a building or repeated work location.
- Move a planned permanent operation to a location that stays usable during the observed high-water event. Keep the temporary flotsam route governed by its own tide condition.
- Recheck the new area through the risky tide state. Verify that transit and the permanent operation still work once the beach itself is unavailable.
How to tell it worked
The permanent location stays dry through the observed spring tide, while your collectors use temporary beach trips only when appropriate.
If you are still stuck
A location visible at a normal low tide may still flood in a spring tide. The announcement does not give a universal elevation cutoff, so observe the actual terrain.
Mark the highest water you actually see
Find the place you intend to build and choose a landmark visible from higher ground. During a spring tide, compare the water against that landmark and the entire building footprint you were considering. A low water observation only establishes that the ground was exposed at that moment. The developer explicitly warns about several beach areas flooding in spring tide. Base the placement on an observed high-water event at that stretch of shore.
Look for a higher candidate on ground that does not sit in the flooded area you observed. Keep a second candidate available so you can change the choice before committing to a lower location. A higher center point is useful only if the location is suitable as a whole. Compare the edges closest to the water as well as the portion where the robot ordinarily arrives.
Check the approach while water is high
Walk through the robot's intended work route in your test. Identify where it comes from, where its route crosses low ground and where it enters the building area. Observe a robot during a representative high-water state if possible. If the destination remains above the water but the path runs through flooded ground, choose another approach or move the planned permanent work inland. The check is whether the job can reach its target in the conditions that matter for that route.
Keep the temporary flotsam route separate in your plan. It can start inland, touch the foreshore at a useful tide and return. Permanent work needs a site and approach that do not rely on this brief window. A path that worked for the Collector during a single good pickup gives only one observation of the shoreline.
Diagnose a site that is already in the wrong place
If you can see floodwater reaching an existing building when the tide rises, record exactly which site and path are affected. Pick an alternative using the visible boundary and check it from the same viewpoint. Use the relocation or building choices the current game offers. The source does not specify a construction refund or a universal elevation cutoff, so make the next decision with the available options and observed site.
After placing permanent work on higher ground, verify the route with one robot and reassess it against another observed high-water state. If the robot stays at a safe height but still skips the work, inspect the approach and program separately. That allows you to keep a verified site while solving a different problem with the task itself.